Sakthi Solar System · Since 1999
Power,Refined.
Uninterrupted energy, engineered in Kerala since 1999.
UNINTERRUPTED POWER
Engineered for Kerala & Tamil Nadu conditions.
Years engineering power continuity
Locations across Kerala & Tamil Nadu
Solution lines — from UPS to solar
Scheme subsidy cap referenced in our PM Surya Ghar materials — subject to sanctioning rules.
“Our commitment to quality, reliability, and customer satisfaction has made us a dependable name in uninterrupted power solutions.”
Our solutions
Five disciplines. One ecosystem.
Online and offline UPS, sinewave and squarewave inverters, high-performance batteries, and solar — specified for real sites, not catalogue fantasies.
Residential & MSME
Sinewave Inverter
Clean AC output for sensitive loads at home and work.
Explore →Power continuity
UPS
Online and offline UPS for desktops, SMEs, and critical circuits.
Explore →Energy storage
Lead Acid Battery
Tall tubular, short tubular, and SMF banks engineered for deep duty.
Explore →Mission critical
Online UPS with Lithium Battery
Double-conversion online UPS with lithium energy storage for mission-critical uptime.
Explore →Renewable power
Solar Power System
On-grid, off-grid, and hybrid solar tailored to Kerala & Tamil Nadu rooftops.
Explore →Legacy
From Sakthi Stabilizer to Sakthi Solar System
Born in Palakkad in 1999, we matured alongside Kerala’s electrification story — adding solar, lithium storage, and subsidy-aware project planning without losing the service ethos that built our name.
Read the timeline →Government scheme
PM Surya Ghar — Muft Bijli Yojana
Featured capacities from our presentation: 3 / 5 / 8 kW. Subsidy up to ₹78,000 with 6.5% bank loan planning support.
Planning calculator
Model your rooftop decision
Featured planning sizes from our presentation: 3 / 5 / 8 kW. Subsidy shown here is illustrative — not a sanction guarantee.
System cost (illustrative)
₹3,10,000
Illustrative subsidy benefit
₹48,750
Cap referenced: ₹78,000
Net after subsidy (illustrative)
₹2,61,250
EMI (if 100% financed)
₹5,112
For discussion only — bank terms apply
Subsidy values and eligibility are governed by the official scheme. Figures shown are illustrative for planning discussions — final approval rests with the discom / nodal agency.
Case snapshot
Clinic chain — stable diagnostics during brownouts
We separated critical imaging circuits onto online UPS, kept general loads on efficient sinewave backup, and documented maintenance cadence for nursing staff — so uptime feels boring (which is the point).
See partners & cases →Channel partners
Engineering trust, locally
Our partner network extends installation capacity while keeping specifications disciplined — so every site reflects the same Sakthi standard.
“They sized our backup honestly — no drama during the monsoon weeks when the grid flickered.”
Facility Manager
Healthcare · Malabar region
“Clear on lithium safety, fusing, and what the BMS actually does. That calm competence matters.”
IT Lead
SME · Coimbatore corridor
“Solar paperwork felt overwhelming until the team turned it into a checklist we could execute.”
Homeowner
Palakkad district
Branches
Palakkad HQ + six regional presences
Cochin · Thrissur · Malappuram · Calicut · Kannur · Coimbatore — coordinated from Olavakode.
Schematic map for orientation. Use branch cards for precise directions.
Insights
Editorial notes from the field
2026-04-12
PM Surya Ghar on a Kerala rooftop: what to expect
A practical walkthrough of capacity thinking, paperwork rhythm, and conservative payback framing.
2026-03-28
Lithium vs lead-acid: choosing the right chemistry
Cycle life, footprint, charging personality, and service reality — explained without hype.
2026-03-09
Sizing UPS for clinics and diagnostic corners
Transfer time, earthing, and the difference between ‘works’ and ‘certifiable calm’.
Start a project
Tell us what must never go dark.
Share your loads, timelines, and location — we’ll respond with clear options and transparent next steps.
Call — tap on mobile