Renewable power
Solar power systems — designed for your roof and your bill.
On-grid, off-grid, and hybrid architectures with PM Surya Ghar guidance.
Talk to engineering
Share loads, photos, and goals — we’ll respond with a clear recommendation.
Or call a branch →Why this matters on your site
We translate your daytime consumption, roof azimuth, and shading into a practical PV size — then walk subsidy paperwork, discom timelines, and inverter/battery pairing so the system performs, not just installs.
Installation philosophy
Structural checks, cable routing, and lightning protection are part of our site methodology. We commission with IV curve reasoning, not just ‘LEDs green’.
Representative ranges
On-grid — 3 / 5 / 8 kW
Aligned with PM Surya Ghar headline tiers for planning discussions.
- Net metering pathway
- Safety disconnects
- Monitoring app
Off-grid — 1–10 kW
For locations where the grid is fragile or absent.
- Battery autonomy sizing
- Gen-set integration option
Hybrid + lithium
Peak shaving and backup with intelligent energy management.
- Time-of-use aware
- UPS-grade backup segments
Specification snapshot
Model-specific datasheets are shared during quotation.
| Modules | Tier-1 panels (project-specific) |
|---|---|
| Inverter | Grid-tie / hybrid (design-specific) |
| Protection | DC isolators, SPDs, earthing plan |
| Compliance | Discom / scheme documentation support |
Common use-cases
Explore adjacent solutions
A resilient site often combines PV, inverter/UPS, and storage — intentionally.
Residential & MSME
Sinewave Inverter
Clean AC output for sensitive loads at home and work.
Power continuity
UPS
Online and offline UPS for desktops, SMEs, and critical circuits.
Energy storage
Lead Acid Battery
Tall tubular, short tubular, and SMF banks engineered for deep duty.
Mission critical
Online UPS with Lithium Battery
Double-conversion online UPS with lithium energy storage for mission-critical uptime.
FAQs
Subsidy reduces upfront cost, improving payback — but exact values depend on sanctioned capacity and discom process. We keep estimates conservative until approvals land.